VFKK PROCESSING AND TESTING EQUIPMENTS

Lists of Processing and Testing Equipments No. Equipment Name Model QTY Range of Service Processing Equipments 1 Lathe CA6140  CA6150 205 Machining of 1/2″-20″ fittings 2 NC Lathe CAK6150P 36 Machining of precision valve fittings 3 Special Spherical Turning Lathe SI-129A 5 Special for ball matching 4 Vertical Lathe Single and Double Column 30 To manufacture various large-sized valves of diameter between 1 to 4 meters 5 Vertical Lathe Double Column 2 Machining DN4m and 10T castings 6 Boring Machine T617, T68 16 Machining valves to various geometric shapes 7 Radial Drilling Machine Z3025-Z3080 18 Drilling and tapping 8 Milling Machine XA6132 9 Milled fittings 9 Planning Machine B690 8 Various planed fittings 10 Grinding Machine Surface and External Grinding 10 Various ground fittings 11 Electric Welder AC/DC Silicon Rectifier 35 128 12 Plasma Spray Welder LUP-400PC 1 Spray welding of various sealed valves 13 Argon Arc Welder TIG400A 4 Argon welding of labels etc. 14 Automatic Submerged Arc Welder ZP5 2 Machining of various welded valves 15 Plasma Alloy Powder Automatic Repair Welder L10-00 1 Welding of various sealed valves 16 Plasma Cutting Machine CUT50 1 To cut 17 Automatic Drier ZYH-30 5 To dry 18 Surface Shot Blasting Machine Q476 3 Surface treatment 19 Heat Treatment Vertical Pit Type Furnace 2 Surface spray coating 20 Computer Printer HT3.HTX.HT5 3 Printing various labels 21 Heat Treatment Furnace RX3-602-9 4 Thermal treatment Lifting Equipments 1 Lifting Equipment 1/2″T-20T 76  

QUALITY ASSURANCE MEASURES

We have established a quality assurance system according to ISO9001 Quality Management System standards, to govern the design, production, installation, and service assurance model. https://vfkkc.com/wp-content/uploads/2023/09/26322cd0ea78b659c909377c6fca8691.mp4 Pre-production Preparation Preparation of Documents and Data Operation in strict accordance with the requirements of the quality assurance system files. The technology R & D department is responsible for product design drawings, process documentation, and the necessary tooling design and review, to ensure the correctness of the drawings, and process feasibility. The procurement and supply department is responsible for procurement document preparation by the drawings. The quality control department is responsible for developing inspection plans and inspection regulations. Preparation of Materials The rough, raw materials and purchased components must be run by a qualified vendor. Suppliers must provide qualified certificates (certificates of approval). Process Control Effective control of the factors in the production process (people, machines, materials, regulations, Environment). People We give quality awareness training to staff to enable them to firmly establish the idea of “quality first, prevention first” and give technical training to professional and technical personnel. Machines Our production and testing equipment can well meet production needs. Regular maintenance shall be conducted strictly according to the repair and maintenance program to ensure that the device is in normal working condition. Equipment is operated strictly according to equipment management specifications and production is carried out according to the requirements of technical papers. The main production processes can be finished independently by ourselves. Materials In case of problems arising from rough, raw materials and purchased parts in the process of production, we follow the “cost submitted to time and time submitted to quality”. Regulations We have established an effective quality assurance system, in which everything can be well managed, conducted, supervised, and recorded. We have developed a quality policy and quality objectives to ensure perfect quality.